CH-2025-000227
Location
Switzerland
Internship type
ON-SITE
Reference number
CH-2025-000227
General discipline
Electrical Engineering
Mechanical Engineering
Physics and Physical Sciences
Completed Years of Study
3
Fields of Study
Languages
English Good (B1, B2)
Required Knowledge and Experience
-
Other Requirements
• Willing to spend time in the lab• Interest in learning on the go and showing good adaptability• Patient and curious mindset• Good communication skills, team spirit, and a desire to contribute within a dynamic deep-tech startup.
Duration
26 - 52 Weeks
Within These Dates
01.02.2025 - 30.04.2026
Holidays
NONE
Work Environment
-
Gross pay
3000 CHF / month
Working Hours
40.0 per week / 8.0 per day
Type of Accommoditation
IAESTE LC Zurich
Cost of lodging
800 CHF / month
Cost of living
1650 CHF / month
Additional Info
Any student with Non-EU/EFTA nationality needs an official letter from their university, confirming that the internship is compulsory (required for visa/work permit).
Work description
Data traffic is exploding! At Lumiphase, we are on a mission to create the fastest and most energy-efficient communication chip the world has ever seen – to enable global IT infrastructure to handle this massive increase in data. The internship projects are placed at the heart of our R&D activities and will ensure that our groundbreaking semiconductor chips can realize their full performance potential with appropriate electrical, optical and mechanical integration solutions.Project 3 – Testing Engineering: Data analysis for Silicon Photonics CharacterizationDuring this internship project, you will collaborate closely with R&D engineers to enhance our test capabilities. You will gain understanding of our electrical and optical testing hardware, learn about our characterization methods, and engage in both conceptual and practical lab work. Your daily tasks may include:• Running Design of Experiment to support our new development or failure analysis• Developing Python scripts to improve Test methods and analyzing the data• Sharing reports with the team.
Deadline
04.01.2025