1.1.Zoning of project
The project consists of two domains the human domain areas consisting of 15 main zones located in the
middle towards western part of Beirut Port covering an area of 108.6349 Hectares, the main functions of
this domain are residential, commercial, cultural, touristic-entertainment functions, as shown in Figure1.
The area includes major both landmarks that exceeds other building heights of Current Silo and New
Memorial Sculpture.
The industrial zone is located on the eastern side stretched to the mid-east zone occupying 2 main old
platforms it consists of 3 main zones of area sized 51.3030 Hectares . The main part is the eastern one
with loading and unloading dock and yards, conventional warehouses, trailers, and trucks waiting areas
3
with firefighting department are at the land side of the industrial area linked to city street system from
eastern area of the Port.
The main port administration is in the center of industrial area, with security building located in the
western side of this area. Smaller activities including empty containers, duty free zone and naval base
with new grain silo zone are all located in the middle and western part of industrial area. Project zones
are served by road system covering 22.9714 Hectares, Thus total areas under design of Beirut Port equals
to 182.9093 Hectares.
1.2.Main port area activities
The proposal consists of 7 main functions, starting with already existing industrial activity, proposal had
enriched port area with added human activities as mentioned in table (1) presented below with
corresponding areas and ratios of land uses, buildings and needed domestic car parking in form of
multistory buildings either separated or inserted in main building floors for 2 stories as had been
presented in plans.
1.3.New Beirut Port building mass
Beirut Port proposal buildings’ designated heights with reference to figure 4 that reflects
• The amount of square meters that will carry the internal activities as a main item determining the
capacity of investment proposed.
• The balanced effect of the mass on the total environment both on micro ( local scale) and macro
( Beirut City ) scale.
• The maximum efficiency obtained through the match between types of activities and the selected
building heights.
• The conurbation of activities in terms of buildings and adjacent spaces with surrounding ones.
• The integration of open spaces and green areas layout linked to sea front and whole area of
development with carefully planned pedestrian system.
• Ensuring gradual flow of masses in downwards form starting from inland areas to sea front to
obtain a maximum integration with the whole Beirut topography section in land-sea direction.
• The inland building heights ranges between 9 and 12 stories then lower height buildings are
placed towards sea front with 4 to 6 stories , lowest buildings heights are situated along the axis
linking central part towards Memorial Sculptures. This will in turn support the main idea of
having strong landmarks of new Memorial sculpture and the damaged Remains of Current Silo
to be focus points from sea panorama of Beirut Port at the same time from Beirut City.
• Depending on the previous mentioned strategies for planning and designing Beirut Port area
approaching sustainable environment in the three main dimensions led to a reasonable densified
land use, the resulted F.A.R, for different zones and subzones mainly are within 1.20 to 4.20
ratios except industrial zone with limited building mass.
• Gradual change in building mass is achieved with increasing magnitude from east towards
western zones which is which aims to support economical basis linked to sufficient land for